Bathroom Accessories

Faucets

Sinks / Vanities

Whirlpools

Lighting

Rugs

Browse by Manufacturer


 
 

About Us / Services

 
 

contact us - call us toll-free 1-877-475-6187
 
 
 

Join Our Mailing List

Shipping & Returns

Conditions of Use

Privacy Notice

Contact Us

FAQ


 
 
Back to Americh product listing page

Americh Apron Installation:

  1. Install the tub into the rough stud opening (See Figure 1).
  2. Determine the length of the corner side panels, items A and B. Cut the side panels to the required height and secure to side studs (See Figure 2 & 3).
  3. Cut and position the toe kick, item C, between the two side panels and attach to floor. For proper installation, the vertical leg of the toe kick must be placed flush against the lip of the side panels (See Figure 4).
  1. To install the apron, item D, slide the upper lip of the apron under the edge of the tub rim and position the apron so that a uniform gap is maintained along the tub edge (See Figure 5). A wood block should be installed as a support guide to hold the apron in place.


  1. Using the apron as a template, transfer the location of the two holes at the lower edge of the apron onto the toe kick with a marker.
  2. Remove the apron and set aside.
  3. Drill two 1/4” diameter holes at the locations transferred to the toe kick and install the U-type nut fasteners provided.
  4. Install the apron and secure with two (2) #14 x 20 x 3/4” machine screws. (See Figure 6).
 

 
Merchant Services